Before
After
Jen and I spent last evening laying out the insulation barrier between the concrete floor slab and the gravel underneath. I chose a foil faced bubble wrap. It's about triple the cost of a typical polyethylene tarp. What you get for that money is a warmer concrete slab. And since this will be a living area, it was necessary. I could not afford to add the radiant tubes to the slab like I wanted, so this was the next best thing. Once the slab is poured on Friday, we will be ready to frame the front and back walls, then start the upstairs framing. We should have a first floor deck on by next Friday.
What you are seeing in those pictures above is the underground plumbing for the garage floor drains and the downstairs bath.
Dave